TEX TIN SMELTER SITE

       
Acid Pond Treatement        Aerial Photo 2001              Ditch Sediments Treatment

      
Acid Pond Treatement        Aerial Photo 2003              Impacted Ditch Sediments


Our Role:

  • Ran project from 1999 to 2004 as PRP's Project Manager
Description:

  • 140-acre, former tin smelter
  • Historically significant, only tin smelter in U.S. during WWII
  • Contaminants all inorganic; in soils, sediments, sludges, groundwater and waste products (e.g., slag)

Project Metrics:

  • Approximately:
    • 9,600 cu.yds of impacted ditch sediment
    • 52,000 cu.yds of acid pond sludges

Completed Goals:

  • Treat in place
  • Dispose onsite
  • Strengthen to allow further site development

Lessons Learned:

  • Volume estimates always incorrect; contract accordingly
  • Adjustment of reagent mix can reduce costs

 

Home | About Us | Personnel and Locations | Passaic River Services
PNL's SOQs | Site Information | Public Links | Contact Us
Passaic River Restoration
Consulting Resources for a Protective and Cost Effective Solution